Experience
It is the vast and unrivalled experience of our team and of our expert supply chain that makes us different. The value of our experience is highly valued by our clients - a major proportion of our contracts come to us through referrals, recommendations and repeat work for the same company or the same end-user.
Our expertise is both broad and in-depth. We have a diverse range of public and private sector clients throughout the United Kingdom and overseas, involved in a wide range of industries and sectors. We can work as main contractor or subcontractor and offer a variety of proven, best value construction methods.
As our project portfolio illustrates, our turnkey service is also comprehensive - we can start at the initial vision and concept and follow through to design, installation and validation and provide an ongoing maintenance service. We can even design, supply, manufacture, and install one-off items not available on the open market.
The list below provides details of the numerous current and completed projects by Clean Modules.
Project 1: Special cleanroom style ceiling for electron beam microscope facility
Project 1: New Class 10,000 cleanroom including air system etc. for research into thin film materials
Project 1: Conversion of existing Class 10,000 cleanroom to containment suite for pharmaceutical development work including actives containment boots.
Project 2: Further modifications to cleanroom for an alternative use
Project 3: DQ/IQ/OQ procedures & validation work
Project 4: Consulancy on cleanroom products
Project 1: Design studies for GMP and GLP areas for processing of stem cells & associated products for treatment of inherited diseases in children
Project 1: Uprate Epidemiology Department & Form Clean areas
Project 2: Sundry upgrade projects
Project 1: Mobile Class 5 trace element Container Cleanroom for use on board from the tropics to the Polar Regions for seawater analysis.
Project 2: Upgrade offshoore Cleanroom Container
Project 1: New pharmacy manufacturing unit including rapid gassing systems (h2O2) isolators, microbiology laboratory, non-sterile area & packing facility.
Project 2: Service & Maintenance
Project 1: New ISO Class 7 Low trace element laboratory and ISO Class 5 air systems
Project 2: Re-commission low trace element labrotory after building refurbishment
Project 3: Service & Maintenance
Project 1: Design & Build new containment level 2 Biotechnology Laboratories &cGMP Cell Processing facility
Project 2: New Chemical Engineering Laboratory
Project 1: Relocatable ISO Class 5 facility for the National Stem Cell Tissue Bank
Project 2: Reburshment of virology laboratories
Project 1: Design & Build Cell Therapy Centre for Anthony Nolan at the Nottingham Trent University
Project 1: Modifications and upgrade to ISO Class 7 Gene Therapy Laboraty suite including structural air system & isolator modifications to H&S and EU GMP requirements
Project 2: Routine maintenance & re-validation
Project 1: Combined stem cell research and IVF facility
Project 1: Design & Build Cell Therapy Centre for Anthony Nolan at the Nottingham Trent University
Project 1: Test/validate cleanroom and containment booths for microelectronics research & development. (Physics Dept)
Project 2: Full refurbishment and upgrade of Class 10000 clean room suite for development of silicone/germanium devices including DI water & liquid N2 Systems, Class 10 cabinet, Services spine, re-validation, etc. (Physics Dept)
Project 3: New ISO Class 5 cleanroom for micro-electronics research (Electrical Engineering Dept).
Project 1: Class 7 Cleanroom
Project 1: New ISO Class 5 Cleanroom, including associated services and equipment supply & installation for semiconductor research into sillicone carbide wafers.
Project 1: Test/validate Cleanroom and containment booths for microelectronics research and development
Project 2: Full refurbishment and upgrade of Class 10,000 Cleanroom suite for development of sillicone/germanium devices ioncluding DI water & liquid N2 systems, Class 10 cabinet, service spine, revalidation and other services
Project 1: Refurbish Cleanroom facility for blood cord processing & storage
Project 1: Three Aseptic Suites for Cytotoxic, TPN and Gene Therapy manufactured, housed in a new 400 m2 two storey modular Cleanroom facility
Project 1: Uprate Epidemiology Department & Form Clean areas
Project 2: Sundry upgrade projects
Project 1: Design & Build new containment level 2 Biotechnology Laboratories &cGMP Cell Processing facility
Project 2: New Chemical Engineering Laboratory
Project 1: New ISO Class 7 Laboratory suite for drug development
Project 1: Relocatable ISO Class 5 facility for the National Stem Cell Tissue Bank
Project 2: Reburshment of virology laboratories
Project 1: Modifications and upgrade to ISO Class 7 Gene Therapy Laboraty suite including structural air system & isolator modifications to H&S and EU GMP requirements
Project 2: Routine maintenance & re-validation
Project 1: Combined stem cell research and IVF facility
Project 1: Design and build a new blood cord processing and storage facility
Project 1: Clean store for medical extrusions
Project 1: Design & Build Cell Therapy Centre for Anthony Nolan at the Nottingham Trent University
Project 1: Relocate & extend existing cleanroom facility.
Project 1: Class K Clean moulding & assembly room for manufacture of plastic biotech disposables
Project 1: New Class J Clean blow moulding & packing facility for pharamceutical and blood products
Project 2: Modifications to cleanroom to add additional equipment
Project 3: Dismantle & remove redundant cleanrooms
Project 1: New Class 100,000 flexible mobile moulding and packing enclosure with change area
Project 2: New ISO Class 7 clean moulding facility
Project 1: Testing & improvements to Cleanroom suites including upgrading of air systems and Cleanroom ratings to Class 100
Project 2: New Class 10,000 Cleanroom with full temperature control for assembly of medical components
Project 3: Conversion of Mobile Class 10,000 Clean Enclosure for clean moulding
Project 4: Routine servicing and upgrade services
Project 5: Low humidity, ISO Class 5 Laminar Flow work station
Project 6: Planned maintenance of all Cleanroom suites
Project 7: Modification to Cleanrooms to accommodate automatic assembly equipment
Project 1: New Class 100,000 clean moulding cfacility for drug delivery aerosol components totalling 72m2, including polymer feed system
Project 2: Extension to double area to increase capacity
Project 1: Temporary Grade C clean moulding enclosure
Project 1: Flexible mobile ISO Class 8 clean module enclosure
Project 1: Full refurbishment, uphrade and capacity incrtease of two class J / Class 10,000 clean moulding rooms totoalling 300 m2
Project 2: Design and install temperature control systems for two large Class J moulding cleanrooms
Project 3: Further upgrade and capacity increase of two ISO Class 7 clean moulding rooms & associated areas
Project 1: New 160 m2 class K / class 100,000 clean moulding and packing facility for pharmaceutical containers with seperate class 10,000 clean air systems for moulding plant.
Project 1: ISO Class 5 Clean Moulding & Assembly facility
Project 1: Supply & install air filtration & cooling systems for clean printing & moulding for electronic components.
Project 1: New Class 10,000 cleanroom including air system etc. for research into thin film materials
Project 1: New 210 m2 Class 100,000 cleanroom suite for manufacture of thermo-couples
Project 2: Removal of redundant cleanroom
Project 1: Design & build ISO Class 4 & Class 7 facility for nanotechnology.
Project 2: Train staff in the use of clean rooms.
Project 1: ISO Class 6 Cleanroom and associated laboratories for manufacture of photolithographic production of components for nanotechnology
Project 1: Test/validate cleanroom and containment booths for microelectronics research & development. (Physics Dept)
Project 2: Full refurbishment and upgrade of Class 10000 clean room suite for development of silicone/germanium devices including DI water & liquid N2 Systems, Class 10 cabinet, Services spine, re-validation, etc. (Physics Dept)
Project 3: New ISO Class 5 cleanroom for micro-electronics research (Electrical Engineering Dept).
Project 1: New ISO Class 5 Cleanroom, including associated services and equipment supply & installation for semiconductor research into sillicone carbide wafers.
Project 1: Test/validate Cleanroom and containment booths for microelectronics research and development
Project 2: Full refurbishment and upgrade of Class 10,000 Cleanroom suite for development of silicone/germanium devices ioncluding DI water & liquid N2 systems, Class 10 cabinet, service spine, revalidation and other services
Project 1: BS 5750 Class J clean assembly room with temperature control for manufacture of rotating vacuum seals
Project 2: Incorporation of automatic ultrasonic cleaning systems into cleanroom
Project 1: ISO Class 9 Cleanroom for assembly of aerospace components, associated gas supplies and handling equipment
Project 1: Special cleanroom style ceiling for electron beam microscope facility
Project 1: ISO Class 7 Cleanroom and assictaed facilities for automotive and optical components manufacture
Project 2: Special ISO Class 5 clean air flow coating enclosure for plastic lenses
Project 3: Training of staff in procedures
Project 1: Class J / Class 10,000 clean containment facility for manufacture of radioactive gas sensing devices
Project 2: Upgrade of an existing Class J / Class 10,000 clean containment room for manufacture of radioactive source components
Project 3: New containment laboratory for Categroy 1 pathogens including fit-out etc.
Project 1: Portable container cleanroom for high performance automotivce components.
Project 1: New class 100,000 clean room for manufacture of critical diesel engine components.
Project 2: Special purpose steam bending equipment & associated services & control systems.
Project 3: Special purpose clean cooling water system for manufacture of engine components.
Project 4: Routine servicing of boiler, cooling & associated equipment.
Project 1: Provide toxic gas refuge
Project 1: Clean filling module for pure organic liquids
Project 2: Rebuild flood damaged cleanroom for strong acid dispensing
Project 1: Clean air system for mushroom spore propagation
Project 1: Supply of Cleanroom structure components and related items
Project 1: New ISO Class 8 Cleanroom and associated fit out for optical coatings of plastic mouldings
Project 2: Cooling system to improve coatings equipment performance
Project 3: Extension to Cleanroom and associated works
Project 1: Air filtration and temperature control for paint spraying unit
Project 1: New ISO Class 7 Clanroom and assicoated works for thin film switch manufacture
Project 2: New ISO CLass 5 Laminar Air Flow Cabinets
Project 1: Design and supply clean area upgrade including clean air system and contamination control components for manufacture of diffraction filters
Project 1: ISO Class 7 cleanroom for processing titanium components for CERN project
Project 1: ISO Class 7 cleanroom with Class 5 zone for assembly of spectrometers.
Project 1: Refurbishment of Class 10,000 cleanroom for micro filter assembly & conversion of adjacent laboratory.
Project 1: New cytotoxic laboratory for Nottingham City Hospital, Nottingham, United Kingdom
Project 1: Specialist modular laboratory facility for the Ministry of Defence
Project 1: Structural items for gas bottle processing facility for BOC Wolverhampton
Project 1: Design & Build of a new 406 m2 Pharmacy & Radiopharmacy Aseptic Suite and supporting facilities at Wrexham Maelor Hospital
Project 1: Special investigation & report into clean room performance.
Project 1: New Grade C Pharmacy Aseptic Unit for Great Ormond Street Hospital, London
Project 1: New ISO Class 5 Pharmacy Aseptic Unit & associated fit out for Cytotoxic preparation at Parkside Oncology, Wimbledon, United Kingdom
Project 1: Construction, commissioing and validation of the main pharmacy aseptic unit for TPN and cytotoxic products at Great Ormomnd Street Hospital for Sick Children, London, United Kingdom
Project 1: construction of new phramcy aseptic unit for The London Clinic
Project 1: Design and construction of a new radiophramcy for the London Royal Hospital
Project 1: Construction of new 630 m2 pharmacy aseptic, quality assurance and pre-pack facility at Southend Hospital.
Project 1: Design guidance for a new pharmacy aseptic suite, Ysbyty Gwynedd, Bangor
Project 1: BS 5750 Class L Flexible Mobile Clean Enclosure for development of drug delivery systems
Project 1: Class K Clean moulding & assembly room for manufacture of plastic biotech disposables
Project 1: Design & Construct EU GMP Grade C Cleanroom for manufacture of medical dressings
Project 1: New Class J Clean blow moulding & packing facility for pharamceutical and blood products
Project 2: Modifications to cleanroom to add additional equipment
Project 3: Dismantle & remove redundant cleanrooms
Project 1: Modify & Upgrade existing Cleanroom to EU GMP Grade C standards
Project 2: Temperature & humidity control to Cleanroom suite
Project 1: ISO Class 7 Cleanroom for oral drug delivery system
Project 2: Training of operatives in the use of the Cleanroom and draft operating procedures
Project 1: Design & Build ISO Class 7 Cleanroom facility for the development of ceremic implant materials
Project 1: Testing & improvements to Cleanroom suites including upgrading of air systems and Cleanroom ratings to Class 100
Project 2: New Class 10,000 Cleanroom with full temperature control for assembly of medical components
Project 3: Conversion of Mobile Class 10,000 Clean Enclosure for clean moulding
Project 4: Routine servicing and upgrade services
Project 5: Low humidity, ISO Class 5 Laminar Flow work station
Project 6: Planned maintenance of all Cleanroom suites
Project 7: Modification to Cleanrooms to accommodate automatic assembly equipment
Project 1: Entension to ISO Class 7 CLeanroom for cardiac & related services
Project 1: Start up Clean Assembly module for electro medical devices totalling 18m2
Projects: Several modifications to Class 100 / Class 10,000 Aseptic suites
Project 1: New Grade C cleanroom suite for manufacture of medical devices
Project 2: Conditioning system for cleanroom system
Project 3: ALterations and expension of existing facility
Project 1: Dismantle, move, reconfigure and re-erect 750m2 cleanroom suites from Mangotsfields, United Kingdom to Cape Town for moulding, extrusion and assembly of medical devices
Project 1: New Class J/Class 10,000 clean assembly room totalling 90m2 under a mezzanine floor in an old store for medical device manufacture
Project 2: Modification to cleanroom and new pack room fit-out
Project 1: 240m2 Modular Cleanroom facility for sterile medical products manufacturing
Project 1: validate Class 10,000 cleanroom
Project 1: New Class 100,000 clean moulding cfacility for drug delivery aerosol components totalling 72m2, including polymer feed system
Project 2: Extension to double area to increase capacity
Project 1: Clean air & temperature control system for ISO Class 7 cleranroom for artificial joint assembly & packing
Project 1: Clean air & temperature control system for assembly and packing area for laryngeal and related products
Project 1: New 310 m2 Class 10,000 cleanroom suite for manufacture of sterile teat assemblies. Including all fit-out (conveyors, poylmer feeds, temperature control, etc)
Project 2: Routine service & re-validation
Project 1: Dismantle old cleanroom and install new enlarged 160m2 Class K / Class 100,000 clean assembly
Project 1: New ISO Class 7 development cleanroom for contact lens manufacture
Project 1: Full refurbishment, uphrade and capacity incrtease of two class J / Class 10,000 clean moulding rooms totoalling 300 m2
Project 2: Design and install temperature control systems for two large Class J moulding cleanrooms
Project 3: Further upgrade and capacity increase of two ISO Class 7 clean moulding rooms & associated areas
Project 1: Class K / Class 100,000 clean air and temperature control system for new clean room. Energy recovery system from compressor included in scheme.
Project 2: Modifications & improvements to existing Class 10,000 clean room
Project 1: Conversion of Isolator unit to Class 10,000, positive pressure unit for use in development of artificial bone materials.
Project 1: Start up ISO Class 7 cleanroom with fume cabinet for medical device manufacture
Project 1: Testing and trouble shooting of class 100,000 clean assembly area.
Project 1: Relocate protable Class J / Class 10,000 cleanroom, plus cleanroom protocols and training
Project 2: Clean liquid fiulling rooms with Class J / Class 10,0090 clean air systems
Project 3: Design, development and manufacture of isolator cleaning tools and disposable covers
Project 4: Temperature control for cleanroom suite
Project 5: Upgrade, extend and refurbish cleanrooms to ISO Class 5 (Several cleanrooms)
Project 1: new air condition and filtration fo Class J / Class 10,000 cleanroom suite for manufacture of silicone extrusions for medical use, also HEPA filterd air sypply to Class J / Class 10,000 for silicone curing ovens
Project 1: New Class J / Class 10,000 start up clean moulding room for manufacture of drug delivery devices
Project 1: Extension of existing Class 7 / Class 10000 clean room to 240 sq. m. & associated rest room. & vacuum cleaning system.
Project 2: Design/supply automatic air lock .
Project 3: Annual maintenance.
Project 4: Design & build further extension of ISO Class 7 clean room & associated facilities.
Project 1: New 150 m2 Class J / Class 10,000 / Grade C clean assembly room for manufacture of implants and other medical devices.
Project 2: Upgrade & renovation of clean room elements.
Project 1: Air system for GRade B Aseptic facility
Project 1: Design study & associated works for EU GMP Grade B Cleanroom manufacturing facility
Project 2: Construct new Aseptic Manufacturing facility for TPN & Cytotoxic products
Project 1: New ISO Class 5 batch chemotherapy facility and associated works
Project 2: Modifications to existing clean manufacturing areas
Project 1: New ISO Class 7 Cleanroom facility for manufacture of extemporaneous pharmaceutical products.
Project 2: New Aseptic Manufacturing facility including rapid gassing capabilities
Project 1: New ISO Class 8 Cleanroom for two pharmaceutical packing lines
Project 1: BS 5750 Class K Clean containment suite for growth hormone production
Project 1: New Grade C cleanroom suite for manufacture of medical devices
Project 2: Conditioning system for cleanroom system
Project 3: Alterations and expension of existing facility
Project 1: Special purpose pallet air shower
Project 1: EU GMP Grade B compounding facility and associated materials handling, packing, pharmacy & support facilities totalling 2400 m2
Project 2: Modification to aseptic manufacturing facilities
Project 1: New 450m2 BS5750 Class L clean manufacturing facility (upgradable to BS 5750 Class J) for health food and associated products.
Project 1: Revalidation of Class K / Grade D clean medical support area at Derby City Hospital.
Project 2: Validation of Sterile Services Suite at Hither Green, London.
Project 3: Validation of sterile suite, Battle Hospital, Reading.
Project 1: New 200m2 EU GMP Grade B manufacturing facility for Cytotoxic & TPN Compounding
Project 2: Extension to Cleanrooms at Burton and associated laboratories
Project 1: New Grade C radiopharmacy cleanroom and preparation room suite.
Project 2: Rebuild sterile fluids manufacturing unit to provide Grade B aseptic facilities
Project 3: Design & builds new pharmacy aseptic unit (3 phases)
Project 1: New Class J / Class 10,000 clean moulding room for 5 moulding machines for production of sterile medical devices totalling 95 m2 (1000 ft2).
Project 2: Addition of temperature control system.
Project 3: Design & specification for a new clean manufacturing facility
Project 4: 1500 m2 ISO Class 9 Manufacturing facility for drug delivery systems
Project 1: New ISO Class 5 Pharmacy Aseptic Unit & associated fit out for Cytotoxic preparations.
Project 1: Grade B & C aseptic manufatcuring facility for cytotoxic and TPN compounds
Project 2: Second manufacturing unit for cytotoxic & TPN compounds
Project 1: ISO Class 8 clean air system for liquids & cream filling lines.
Project 1: Design & Built of a blood cord processing & storage facility.
Project 1: New 587 m2 Class C cleanroom & laboratory facility for manufacture of extemporaneous and similar medical products
Project 1: Modular Pharmacy Aseptic Unit for TPN and Cytotoxic Manufacture
Project 1: EU GMP Grade B Aseptic Suite for manufacture of Cytotoxic products
Project 2: Temperature control & isolator extract systems for Aseptic Suite
Project 1: Rebuilt EU GMP Grade B Pharmacy Aseptic Unit & associated works
Project 2: Renew Radiopharmacy air system
Project 1: Renew Radiopharmacy
Project 1: Refurbishment and upgrade EU GMP Grade B aseptic manufacturing suite.
Project 1: Three Aseptic Suites for Cytotoxic, TPN and Gene Therapy manufactured, housed in a new 400 m2 two storey modular Cleanroom facility
Project 1: Upgrade Phramcy Aseptic Unit to meet EU GMP Grade B requirements
Project 2: Sundry upgrades & modifications for bone marrow unit
Project 3: Design & Build of a new Pharmacy Aseptic Facility (Octave Botnar Wing)
Project 4: Design & Specification for CIVAS & TPN Aseptic Unit (Main hospital)
Project 5: New main Aseptic Suite for Cytotoxic and TPN Manufacture
Project 6: Design study for satelite CIVAS Aseptic Manufacturing Unit
Project 7: New Gene Therapy Aseptic Manufacturing Unit
Project 1: New EU GMP Grade B Pharmacy Aseptic licensed manufacturing facility to serve the East Kent NHS Trust area
Project 1: Refurbishment of Pharmacy Aseptic Unit & upgrade to EU GMP Grade B
Project 2: Further upgrade & division of Pharmacy Aseptic Suite
Project 1: New pharmacy manufacturing unit including rapid gassing systems (h2O2) isolators, microbiology laboratory, non-sterile area & packing facility.
Project 2: Service & Maintenance
Project 1: Rebuild and upgrade radiopharmacy including redesigned lay-out, new air system, safety cabinets, structure and finishes to provide Grade B aseptic facilities.
Project 1: New modular pharmacy aseptic unit for cytotoxic and TPN manufacture
Project 1: New pharmacy aseptic unit
Project 1: Design & Specification of Radiopharmacy Rebuild
Project 2: New Radiopharmacy Facility
Project 1: New cytotoxic laboratory
Project 1: Clean air and temperature control systems for oncology wards for neutropaenic patients
Project 2: Refurbish clean air system after fire damage
Project 1: Rebuild & Upgrade Radionpahrmacy including redesigned lay-out, new air system, safety cabinets, structure & finishes to privide EU GMP Grade B Aseptic facilities.
Project 1: Upgrade aseptic suite fit out (2 sites)
Project 1: Full refurbishmentr of aseptic suite including new air system, termperature control, etc. for TPN, cytotoxic and CIVAS production in EU GMP Grade B conditions
Project 2: Planned maintenance of new aseptic unit clean air plant
Project 3: Design and construction of new pharmacy aseptic unit
Project 4: Design and construction of pharmacy cold store
Project 1: renew cytotoxic air extract system
Project 1: Combined stem cell research and IVF facility
Project 1: Refurbishment of radiopharmacy
Project 1: Consultancy on new pharmacy manufacturing unit
Project 1: Feasibility design for new phramcy and radiopharmacy aseptic facility
Project 1: Design and specification of a new pharmacy aseptic unit integrated with a pre-Pack unit, QA laboratory & Pharmacy Administration.
Project 2: Construction of new 630 m2 pharmacy aseptic, quality assurance and pre-pack facility.
Project 1: Process recording equipment.
Project 2: Routine service/calibrate pharmacy recording equipment.
Project 3: Design & build a new modular aseptic suite for Cytotoxic & Civas products.
Project 1: Design, construct, commission & validate a new pharmacy aseptic facility for cytotoxic & drugs trials product manufacture.
Project 1: Design & specification for the Cytotoxic aseptic manufacturing unit at the new Cancer Centre, Devonshire Place
Project 1: New modular aseptic manufacturing facility & integration with existing facilities in the host building.
Project 2: Provision of covered walkway & associated works for main public access to the hospital.
Project 3: Design & specification to rebuild pharmacy aseptic facilities.
Project 1: Portable container cleanroom with twin Grade B aspetic facilities for cytotoxic and TPN production
Project 2: Validation services to portable container and in-situ cleanrooms
Project 3: Design of new pharmacy and radiopharmacy aseptic facility
Project 1: New modular aseptic manufacturing facility & integration with existing facilities in the host building.
Project 2: Provision of covered walkway & associated works for main public access to the hospital.
Project 3: Design & specification to rebuild pharmacy aseptic facilities.
Project 1: Mobile Grade C aseptic pharmacy unit for cytotoxic reconstitution.
Project 1: Relocatable aseptic unit for cytotoxic manufacture
Project 2: New modular Cytotoxic pharmacy aseptic unit
Project 1: Design study for new pharmacy aseptic unit.
Project 2: Manufacture of modular pharmacy aseptic unit.
Project 1: Upgrade of Opthalmic Operating Treatre & associated new air system
Project 2: Routine Maintenance
Project 3: Upgrade Opthalmic Laser Treatment Unit
Project 1: Extension to ISO Class 7 Cleanroom for cardiac & related devices
Project 1: Works for operating theatre
Project 1: Minor procedures operating theatre
Project 1: New ophthalmic operating theratre with ultra clean zone
Project 1: Refurbishment works to Catogroy 4 Laboratory
Project 1: New pharmacy manufacturing unit including rapid gassing systems (h2O2) isolators, microbiology laboratory, non-sterile area & packing facility.
Project 2: Service & Maintenance
Project 1: Design & Build new containment level 2 Biotechnology Laboratories &cGMP Cell Processing facility
Project 2: New Chemical Engineering Laboratory
Project 1: Specialist modular laboratory facility
Project 1: Relocatable ISO Class 5 facility for the National Stem Cell Tissue Bank
Project 2: Reburshment of virology laboratories
Project 1: ISO Class 6 Cleanroom and associated laboratories for manufacture of photolithographic production of components for nanotechnology
